Thursday, June 11, 2009

May Dive
















We decided it was time for a break from the never-ending work list. Here are some photos of our latest dive. We went to Gun Beach, which is on the North-West coast of the Island. The Mantaray hve been said to be swimming there lately. Unfortunately, we didn't see any. However, it was wonderful just getting back in the water! Despite the equipment issues we were having (i.e. Brett's secondary breather was leaking air from the start, the camera was acting up, and my secondary breather started leaking air during the dive), we still had a full and enjoyable dive. Although, we did cut it down to a 1-tank dive, versus the 2 we were planning, and opted for taking our equipment in for inspection and repair. In the photos you can see Brett feeding the fish. The big sight on this dive however was the beautiful and large spotted puffer fish. We were able to get some close-ups of him!

Kitchen Molding
















Well, the work continues on...the crown molding and base boards have been installed.The large piping above the stove cabinets are going to be painted copper, which will blend in nicely (we hope) with the rest of the kitchen without having to create an ugly box to cover it up.

Wednesday, May 6, 2009

Chicken Coop
















Amidst getting the kitchen together, we have worked diligently on getting the chicken coop built. Primarily because the odor has begun to escape the chicken's temporary bathroom nest, and travel down the stairs into the rest of the house. The cleaning of the bathroom surprisingly only took a few hours. Mainly because our bathroom floors are a good inch below the rest of the floors in the house. Designed that way to prevent potential flooding. They also come equipped with a floor drain. This made it much easier, as I was able to take the shower sprayer and hose the crap (literally) out of the bathroom! LOL As you can see, the chickens have really grown up, and have become an annoying obsession for Calypso.

Kitchen Nearly Done
















Well...here we are...it's nearly done now!!! Just a few finishing touches left. We have a few doors giving us some problems, crown molding and kick boards to install, and painting to touch up. The triple basin sink is one of our favorites! Thanks to mom and dad for going through ALL of the effort and trouble in getting it shipped out to us!!!! P.S. Despite the fact that the only pictures I seem to be in are of me standing here lounging with a glass of wine, believe me...I've been doing plenty of work on getting this done as well. It's just that I (unlike Brett) will stop in the middle of working to take photos, which is why you've only been seeing him working...and don't let him tell you otherwise. :)

Friday, April 24, 2009

Installation of Granite Counter tops
















The lower cabintes are leveled, and bolted into the wall...and here comes the granite counter tops!!!

Wednesday, April 15, 2009

Cabinet Doors
















Cabinet doors...Finally!

Finishing Lower Cabinets













The progress continues!


Installing Microwave
















Here you can see the continuation of the building of the cabinets...we're on to the lower cabinets now. We're also doing a hard-wired installation of the new microwave oven (which also serves as the venting system for our stove). Finally...a bit of R&R!

Friday, April 10, 2009

Hanging the upper cabinets
















Hanging the upper cabinets!!! Okay...our arms are sore, our backs are killing us, and our hearing is depleting from the echoing noise of drilling into cement. :) The life of remodeling!

Floor and cabinets
















Finishing the new tile floor by cleaning off the excess grout, grout haze, and sealing the grout. Now we start building the upper cabinets! You can also see the new dishwasher and gas stove.